I am sure the prices are a bit higher and I would add on features that are not included in the $300.00 price they list, but let me tell you we have some serious winds here in KY and that is where the university built these on that budget.
http://www.uky.edu/Ag/CCD/hightunnel.pdf
My additions would / will be boxing in the raised beds. This way, I can run a bolt threw the PVC, anchor and lumber for more security. Plan is to start work on the boxes in the next week or two, transplant into them and then raise the thing over existing plants this fall. That way we can space out the money.
Door frame for front and rear will be built around two 4 x 4s sunk into concrete which are as tall as the highest point of the thing. Then connect the pvc at top to the 4x4s for additional strength.
Thoughts?
http://www.uky.edu/Ag/CCD/hightunnel.pdf
My additions would / will be boxing in the raised beds. This way, I can run a bolt threw the PVC, anchor and lumber for more security. Plan is to start work on the boxes in the next week or two, transplant into them and then raise the thing over existing plants this fall. That way we can space out the money.
Door frame for front and rear will be built around two 4 x 4s sunk into concrete which are as tall as the highest point of the thing. Then connect the pvc at top to the 4x4s for additional strength.
Thoughts?