Well, didn't want to keep hijacking the other thread with pics and discriptions, so here we go. The project so far. I've got almost all of the parts needed but I'm waiting on a 1/2" Brass bulkhead that I had to order off the net. Here's a pic of some of the equiptment so far:
The Keg on the left will be where I boil the wort (it's called a Keggle). Still have to install the spout and dip tube w/ filter. The cooler on the right with be my mashing unit where the grains will be kept at a certain temp for a certain time to properly convert all the sugars into fermentables (also have to install the spout...darn bulkhead is holding me up).
The whole set up will probably be complete within a few weeks. Parts I still need: Turkey Fryer base with propain tank and a 5 gallon cooler which will serve as my hot water tank for sparging. Not pictured, miselanious parts, tubing, cpvc filter.
More updates when they become available will be posted.
The Keg on the left will be where I boil the wort (it's called a Keggle). Still have to install the spout and dip tube w/ filter. The cooler on the right with be my mashing unit where the grains will be kept at a certain temp for a certain time to properly convert all the sugars into fermentables (also have to install the spout...darn bulkhead is holding me up).
The whole set up will probably be complete within a few weeks. Parts I still need: Turkey Fryer base with propain tank and a 5 gallon cooler which will serve as my hot water tank for sparging. Not pictured, miselanious parts, tubing, cpvc filter.
More updates when they become available will be posted.