Phil said:ASME Boiler & Pressure Vessel Code Section V, VIII, and IX. ASME B&PV Code B31.3 Process Piping, API 510, 570, 571, 572, 576, & 577..... I miss having time for recreational reading.
D3monic said:Just finished reading Vengeance of the Iron Dwarf by R.A Salvatore one of my favorite authors. http://www.amazon.com/gp/product/0786965703?ie=UTF8&tag=rasalvatorecombo&linkCode=as2&camp=1789&creative=9325&creativeASIN=0786965703
Here you go phil, our new facility finishing construction. Capacity to unload 130 rail cars at once, two 150k barrel storage tanks with permitting for 4 more. 4 boilers with permitting for 13 more for steaming the rail cars, hot oil heat trace. ect ect ect. Really nice facility. Should be getting our first rail car in Wed and floating the first tank roof. Sorry no pics of the manifold system but it's pretty nice as well. All overhead cable trays and above grade piping other than the pipeline. Big step up from my old facility where everything was buried and deadlegs galore. Thankfully I'm a board operator so I don't have to play with the railcars and all that hose wrestling.
hogleg said:P.S. I already know everything. I don't need to read anymore. And if I do its only to critique and correct.
able eye said:
hogleg said:
Exactly, my point.
Phil said:ASME Boiler & Pressure Vessel Code Section V, VIII, and IX. ASME B&PV Code B31.3 Process Piping, API 510, 570, 571, 572, 576, & 577..... I miss having time for recreational reading.
able eye said:
Pretty sure I'll never get around to checking that book out.
D3monic said:The Necroscope series are a good read but really slow on the start. If you can make it through the first half of the first book.